hoffman building

Buildings for the work that happens inside them.

We focus on six kinds of industrial clients. Each has its own code questions, equipment and schedule pressures, and we plan for them from the first site walk.

Manufacturing

Typical work

Plant additions, production bays, crane-served high bays, mezzanines, process rooms.

What we plan for

Power capacity, floor flatness for equipment, keeping lines running during tie-ins.

Warehouse & distribution

Typical work

Dry warehouse buildings and expansions, dock additions, truck courts, racking-ready slabs.

What we plan for

Clear height, dock count, fire protection for high-piled storage.

Food & beverage processing

Typical work

Washdown rooms, cooler and freezer additions, packaging areas, sanitary finishes.

What we plan for

Dust and contamination control during work, insulated panels, drainage slopes.

Fleet & equipment shops

Typical work

Pre-engineered metal shop buildings, wash bays, service pits, parts storage.

What we plan for

Oversized doors, ventilation, trench drains and oil separators.

Agriculture & ag equipment

Typical work

Machine storage, dealership service shops, steel buildings on rural sites.

What we plan for

Long clear spans, site utilities, frost-protected foundations.

Industrial tenants

Typical work

Fit-outs of leased flex and industrial space: offices, power upgrades, dock work.

What we plan for

Landlord approvals, lease timelines, restoration clauses.

National cost benchmarks, before we see your site

Hard-cost ranges published in September 2026 for U.S. commercial construction. Regional conditions can move these 25–50% either way, and soft costs usually add 15–30%. Your Site & Budget Review replaces them with a number for your building.

Building typeHard cost per SF
PEMB steel warehouse, shell only$14–30
PEMB warehouse, fully built out$50–100+
Dry warehouse$55–175
Cold storage$130–350+

Source: Terrapin Construction Group commercial construction cost guide, September 2026.

Why we lock prices early

The Mortenson Construction Cost Index for Q3 2026 put Minneapolis non-residential costs up 2.86% in one quarter, the highest of the eight cities it tracks. Steel, aluminum and most copper products carry 50% Section 232 tariffs on their full value.

That is why our quotes are held for 60 days, steel and electrical packages are bought early when you approve it, and GMP contracts carry a named contingency instead of padding hidden in line items.

Illustrative product interface

Source: Mortenson Construction Cost Index, Q3 2026 report (Q2 2026 data).

Tell us what runs in your building.